Fars Regional Water Company Consultant 
                                    
                                        Absar Fars Consulting Engineers
                                    
                                
                            This project was implemented with the aim of purifying and supplying drinking water from Tangab dam to the city of Firouzabad with a capacity of 240 liters per second. Considering the limited space of the treatment plant, and the need for a continuous supply of drinking water, the pumping station package method was proposed to be used in this design.