The goal of this plan is to supply water to a population of about four million seven hundred thousand people, equivalent to 52 percent of the population of Khuzestan province by 1425. By designing, building, and setting up the pumping station package within 20 days alongside the presence at the water supply stage to the Chazzabeh border’s terminal, Ettesal Mechanic was able to set the record for the fastest implementation of a water pumping station in the country.