The Pumping Station Package of Bonak Abad+ Intelligentization of the Primary Pumping Station

  • Employer: Employer Regional Water Company of Lorestan (Ab-baran Cooperative)
  • Consultant Company: Consultant Company Rud Ab Paydar Consulting Engineers
Details

The pumping station package of the Bonak Abad’s pressurized irrigation network was installed to supply water to 313 hectares of land in the Bonak Abad region in order to remove deprivation from the local residents and develop the rainfed lands; moreover, the water required by the four irrigation areas of this irrigation network is supplied in the form of a single pumping station package.