The primary objective of this project was to ensure the provision of necessary water supply to the industrial area of Babak city and address the issue of pressure drop within the urban network resulting from the consumption of the industrial sector. To achieve these goals, the project successfully utilized a pumping station package that effectively maintained the required pressure levels for both the urban and industrial networks.